Continuous flow in nests and production lines

Target group:

Engineering staff, project teams and managing staff.

Training program:

  • Introduction to lean methodology – identification of wastes in production processes,

  • Learning through play – simulation game,

  • Idea of pull system, system initiation methods,

  • Methods of current production lines and nests analysis,

  • Ways to determine recent workload of employees and equipment,

  • Determination of required number of operators per specific production nests and lines,

  • Disadvantages and benefits of machine park location basis on technological and process similarity,

  • Line balancing, yamazumi. SMED as tools supporting implementation of one piece flow,

  • Development of single stream flow basis on MTM.

 

Program may be changed as per individual customer’s requirements.

Duration of training: